1- South Pars Gas Field Dev. Phase1 SPQ1, SPF 1 & 2 Jackets & Piles
2- South Pars Gas Field Dev. Phases 6, 7 & 8 SPD7 Jacket & SPD7,8 & 9 Piles
3- Turkmenistan Gas Compressors Station
4- South Pars Gas Field Dev. Phases 9 &10 SPD10 &11 Jackets
5- Masjed Soleyman Hydro-Electric Power Project, Power House Cavern Fab. & Erec.
| > SOUTH PARS GAS Field Dev. Ph.1SPQ1, SPF1 & 2 Jackets |
|
| |
|
|
|
|
Clients : |
P.O.G.C / PETROPARS / I.O.E.C |
|
|
Scope : |
Jackets & Piles Construction-ready for load out (including load out support) |
|
|
Work Volume : |
- SPQ1 jacket, 3000 Tons
- SPF1 & Jackets, 2 × 300 Tons
- SPQ1, SPF 1&2 Piles, 2000 Tons |
|
|
Starting Date : |
Mar. 2002 |
|
|
Duration : |
- Contractual: 10 months
- Actual: 10 months |
|
| |
|
|
|
|
| > SOUTH PARS GAS Field Dev. Ph.6,7&8 SPD7 Jacket & SPD7,8&9 Piles |
|
| |
|
|
|
|
Clients : |
P.O.G.C / STATOIL / ISOICO |
|
|
Scope : |
Jackets & Piles Construction-ready for load out (including load out support) |
|
|
Work Volume : |
- SPD7 Jacket, 1600 Tons
- SPD8 Jacket (Partial), 450 Tons
- Temporary Deck, 2×150 Tons
- SPD7,8&9 Piles, 3000 Tons |
|
|
Starting Date : |
Mar. 2003 |
|
|
Duration : |
- Contractual: 10 months
- Actual: 11 months |
|
| |
|
|
|
|
| > TURKMENISTAN GAS COMPRESSOR STATION |
|
| |
|
|
|
|
Clients : |
MAN FERROSTAAL / ODCC |
|
|
Scope : |
- Detail Engineering for all Structural Steels (Buildings, Walkways, Platforms & …), HVAC
- Procurement of all Civil & Building Construction Materials including HVAC
- Construction of Civil, Buildings Mechanical, Piping, Painting, Insulation, Electrical & Instrumentation including Fire Proofing, Coating,…
- Precommissioning & Vendor’s Assistance of whole Gas Plant |
|
|
Starting Date : |
Jan. 2003 |
|
|
Duration : |
- Contractual: 15 months
- Actual: 18 months |
|
| |
|
|
|
|
| > SOUTH PARS GAS Field Dev. Ph.9&10 SPD10 & 11 Jacket Fab. |
|
| |
|
|
|
|
Clients : |
P.O.G.C / I.O.E.C |
|
|
Scope : |
Jackets Fabrication-Ready for load out (including load out support) |
|
|
Work Volume : |
- SPD10 Jacket, 1550 Tons
- SPD11 Jacket, 1550 Tons |
|
|
Starting Date : |
Jan. 2004 |
|
|
Duration : |
- Contractual: 8 months
- Actual: 9 months |
|
| |
|
|
|
|
| > Masjed Soleyman Hydro-Electric Power Project, Power House Cavern Fab. & Erec. |
|
| |
|
|
|
|
Clients : |
DEALIM / SANAT-POL |
|
|
Scope : |
Cavern Structural Roof Detail Design, Material Supply, Fabrication & Erection |
|
|
Work Volume : |
350 Tons |
|
|
Starting Date : |
Apr. 2002 |
|
|
Duration : |
- Contractual: 6 months
- Actual: 8 months |
|
| |
|
|
|
| |
|